Maintenance Timing
Medium
Jan 29

Defer C-Check on A7-AAA to align with lease return

A7-AAA has a C-Check scheduled for Q3 2026, but the lease expires in Q4 2026. Deferring the C-Check and performing it as part of redelivery could eliminate duplicate inspection costs.

Potential Cost Savings
$661,783
Source
Maintenance Schedule Analysis
Current State· Before recommendation
Scheduled C-Check (Q3)Standalone C-Check event
$851K
Redelivery C-Check (Q4)Required check at redelivery
$851K
Aircraft downtime costsRevenue loss during checks
$189K
Total Projected Cost$1.89M
Recommended State· After recommendation
Combined redelivery C-CheckSingle consolidated check
$1.04M
Single downtime periodReduced revenue impact
$184K
Total Projected Cost$1.23M
Before
$1.89M
After
$1.23M
You Save
$662K
AI Reasoning

The lease return conditions require a fresh C-Check at redelivery. Performing a C-Check now and again at redelivery would result in approximately $1.8M in avoidable maintenance costs. The aircraft is currently within deferral limits per the MPD.

Recommended Action

Obtain deferral approval from QCAA and lessor technical team. Update maintenance planning schedule.

Generated Jan 29 via Maintenance Schedule Analysis